FACILITY MANAGEMENT WITH MAXIMO

Facility Management is an interdisciplinary area of expertise for the management of spaces, infrastructure, employees and business functions such as airports, offices, banks, schools, congress centers, shopping malls, hospitals, hotels and factories.

BIM (Building Information Modeling) technology, which covers every process in the building life cycle, has been used for processes such as facility management, operation, inventory management, maintenance and repair works after the construction is completed.

BIM is a model-based process that delivers value throughout the building lifecycle.

At the core of the BIM process, there are information-rich 3D models that can be used in planning, design, construction and management processes.

 

Contribution of BIM to Asset Management

With IBM Maximo and Autodesk Revit Integration, it is possible to show the three-dimensional state of the facilities on an inventory management application.

Data Flow Between AUTODESK Revit and IBM Maximo

  • Data Flow Between AUTODESK Revit and IBM Maximo
    • It reduces the time and cost of data collection required to use the following technologies:
      • CMMS (Computerized Maintenance Management System)
      • CAFM (Computer Aided Facility Management)
      • BAS (Building Automation System)
      • SCADA (Supervisory Control and Monitoring System)
    • It enables maintenance technicians to locate the relevant equipment precisely and allows 3-dimensional viewing of the relevant technical documents. This saves time in accessing the relevant asset’s information and enables the task to be performed faster, more efficiently and securely.
    • Data quality is improved and there is no need for paper documents.
  • The time and cost required to understand the problems in the devices is reduced.
  • It provides better building and device performance. (Safety and energy usage)
  • It provides the use of integrated systems to plan the changes to be carried out in the facility.
  • It provides better management of the construction area to be set up for renovation or modification with the help of BIM.
  • It allows the manager to see the facility in real time with the changes to be made on the model on the operator’s side.
  • Assets in the BIM model are transferred very quickly and accurately to existing inventory management software. Thus, the time to create an asset record in the inventory management software is shortened.