{"id":492,"date":"2018-10-30T08:40:48","date_gmt":"2018-10-30T08:40:48","guid":{"rendered":"https:\/\/seksenyirmi.com\/intesasoft\/?p=492"},"modified":"2021-09-28T20:16:00","modified_gmt":"2021-09-28T20:16:00","slug":"ibm-maximo-ile-tesis-yonetimi","status":"publish","type":"post","link":"https:\/\/intesasoft.com\/en\/cozumlerimiz\/ibm-maximo-ile-tesis-yonetimi\/","title":{"rendered":"FACILITY MANAGEMENT WITH MAXIMO"},"content":{"rendered":"<p>[vc_row][vc_column][vc_column_text]<\/p>\n<h1><span style=\"font-size: 24pt;\">FACILITY MANAGEMENT WITH MAXIMO<\/span><\/h1>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]<strong>Facility Management <\/strong>is an interdisciplinary area of expertise for the management of spaces, infrastructure, employees and business functions such as airports, offices, banks, schools, congress centers, shopping malls, hospitals, hotels and factories.[\/vc_column_text][vc_single_image image=&#8221;505&#8243; img_size=&#8221;full&#8221;][vc_column_text]<strong>BIM (Building Information Modeling)<\/strong> technology, which covers every process in the building life cycle, has been used for processes such as facility management, operation, inventory management, maintenance and repair works after the construction is completed.<\/p>\n<p>BIM is a model-based process that delivers value throughout the building lifecycle.<\/p>\n<p>At the core of the BIM process, there are information-rich 3D models that can be used in planning, design, construction and management processes.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Contribution of BIM to Asset Management<\/strong>[\/vc_column_text][vc_row_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;509&#8243; img_size=&#8221;full&#8221;][vc_column_text]With IBM Maximo and Autodesk Revit Integration, it is possible to show the three-dimensional state of the facilities on an inventory management application.[\/vc_column_text][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_single_image image=&#8221;510&#8243; img_size=&#8221;full&#8221;][vc_column_text]<\/p>\n<p class=\"p1\"><span class=\"VIiyi\" lang=\"en\"><span class=\"JLqJ4b ChMk0b\" data-language-for-alternatives=\"en\" data-language-to-translate-into=\"tr\" data-phrase-index=\"0\">Data Flow Between AUTODESK Revit and IBM Maximo<\/span><\/span><\/p>\n<p>[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][vc_row_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text]<\/p>\n<ul class=\"ul1\">\n<li class=\"li1\">Data Flow Between AUTODESK Revit and IBM Maximo\n<ul>\n<li>It reduces the time and cost of data collection required to use the following technologies:<\/li>\n<\/ul>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>CMMS (Computerized Maintenance Management System)<\/li>\n<li>CAFM (Computer Aided Facility Management)<\/li>\n<li>BAS (Building Automation System)<\/li>\n<li>SCADA (Supervisory Control and Monitoring System)<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<ul>\n<li>It enables maintenance technicians to locate the relevant equipment precisely and allows 3-dimensional viewing of the relevant technical documents. This saves time in accessing the relevant asset\u2019s information and enables the task to be performed faster, more efficiently and securely.<\/li>\n<li>Data quality is improved and there is no need for paper documents.<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column_inner][vc_column_inner width=&#8221;1\/2&#8243;][vc_column_text]<\/p>\n<ul class=\"ul1\">\n<li>The time and cost required to understand the problems in the devices is reduced.<\/li>\n<li>It provides better building and device performance. (Safety and energy usage)<\/li>\n<li>It provides the use of integrated systems to plan the changes to be carried out in the facility.<\/li>\n<li>It provides better management of the construction area to be set up for renovation or modification with the help of BIM.<\/li>\n<li>It allows the manager to see the facility in real time with the changes to be made on the model on the operator\u2019s side.<\/li>\n<li>Assets in the BIM model are transferred very quickly and accurately to existing inventory management software. Thus, the time to create an asset record in the inventory management software is shortened.<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column_inner][\/vc_row_inner][\/vc_column][\/vc_row][vc_row][vc_column][\/vc_column][\/vc_row]<\/p>","protected":false},"excerpt":{"rendered":"<p>With IBM Maximo and Autodesk Revit Integration, it is possible to show the three-dimensional state of the facilities on an inventory management application.<\/p>\n","protected":false},"author":1,"featured_media":494,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4],"tags":[],"class_list":["post-492","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cozumlerimiz"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/intesasoft.com\/en\/wp-json\/wp\/v2\/posts\/492"}],"collection":[{"href":"https:\/\/intesasoft.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/intesasoft.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/intesasoft.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/intesasoft.com\/en\/wp-json\/wp\/v2\/comments?post=492"}],"version-history":[{"count":31,"href":"https:\/\/intesasoft.com\/en\/wp-json\/wp\/v2\/posts\/492\/revisions"}],"predecessor-version":[{"id":1960,"href":"https:\/\/intesasoft.com\/en\/wp-json\/wp\/v2\/posts\/492\/revisions\/1960"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/intesasoft.com\/en\/wp-json\/wp\/v2\/media\/494"}],"wp:attachment":[{"href":"https:\/\/intesasoft.com\/en\/wp-json\/wp\/v2\/media?parent=492"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/intesasoft.com\/en\/wp-json\/wp\/v2\/categories?post=492"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/intesasoft.com\/en\/wp-json\/wp\/v2\/tags?post=492"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}